Nicholas Institute for Environmental Policy Solutions
Cover image: Aerial drone picture of a hyperscale data center campus with cooling steam rising from industrial cooling systems, located along the Columbia River in Oregon.
Report

Controlling Impacts of Data Centers on Electricity Generation Costs: A Modeling Analysis

Abstract

This analysis evaluates ways that data center operations can be adjusted to control the impacts of their electricity demand on the grid’s wholesale generation costs. Given that forecasts suggest that data centers may represent 10% or more of total electricity demand within the next five years, and the existing concerns about their effects on electricity prices for other customers, it is important to understand how to mitigate any potential increases in generation costs. The analysis estimates how various flexibility options, requirements for peak capacity margins, and different amounts of “bring your own power” arrangements may alter system costs. The results also show which potential actions might allow data centers to fully offset any cost impacts on the utility grid.

Overview

Data Centers in an Era of Rising Electricity Prices

The electricity sector is facing a period in which demand has been—and will continue to—rise at annual rates not seen since the 1960s and 1970s (EIA 2025a, b). Much of this growth is being driven by data centers, but other sources of demand, such as electric vehicles, building and industry electrification, and manufacturing onshoring, are expected to contribute to these trends in the future.1

At the same time that data center demand has been expanding, electricity prices (in nominal terms) have been rising rapidly. Coming at a time when people already have affordability fears, the United States is seeing communities push back against data centers over concerns about rising power prices, along with other issues such as water usage and environmental impacts (Mineo 2026).

Donohoo-Vallett et al. (2026) explored the key drivers of recent and prospective changes in electricity prices. They found that over the last five years, some common concerns have had relatively modest impacts on prices. Federal policies and utility profits have had only minimal impacts. Other considerations, such as load growth (aside from specific areas like PJM), extreme events (aside from states such as California and Maine with large costs from fires and storms), clean energy policies, transmission spending, and natural gas prices, have had more moderate impacts on recent prices.2 Inflation and equipment costs have had the most influence in recent years.

Real inflation-adjusted electricity prices have been relatively flat through 2025 (not counting recent events such as the capacity auctions in PJM).3 Going forward to 2030, however, the Donohoo-Vallett et al. (2026) analysis suggests that load growth, transmission infrastructure needs, and natural gas price increases have the potential for major price impacts. They further note that, while recent load growth from data centers has generated a lot of attention, this load growth has historically been correlated with lower electricity prices at the national level as the growth allows the grid’s existing generating capacity to be used more efficiently.

Along these lines, Energy and Environmental Economics recently reviewed 11 studies of data center impacts on prices and similarly found that, while many factors affect the pressure on electricity prices, the relationship between load growth and rising rates is unclear (E3 2026). Relatedly, Norris et al. (2025) examined the ability of existing infrastructure to meet expanded load from data centers and found that the flexibility to curtail data center operations during a very limited number of peak demand hours would enable current generating capacity to handle a significant increase in data center load.

Several other recent studies have extended these ideas and discussed ways that improving system utilization can potentially lower rates for some or all customers. EPRI notes that data center impacts on electricity prices in the future will depend on whether serving new customers costs more or less than average costs today (EPRI 2026b). They mention proactive planning, well-designed rate (tariff) contracts, and demand flexibility as contributing factors that can allow growing demand to potentially lower average costs by improving utilization of existing assets and accelerating deployment of clean generation. Hledik et al. (2025) provide illustrative examples of situations in which load growth could either increase or decrease rates, depending on assumptions about flexibility and whether the additional load improves system utilization. However, their example results for an illustrative utility are dependent on assumptions about system utilization and the hourly pattern of existing and new demands.

The present analysis is intended to extend these illustrative examples of a generic utility to a more detailed characterization of the US wholesale generation system as a whole and to examine implications over the next decade.

While data centers are (currently) unique in their rate of growth, all sources of electricity demand growth will require at least some new capacity in the future, regardless of how efficiently the system operates. Given the significant forecasted increases in electricity demand from data centers (e.g., 400 to 800 TWh for data centers by 2030 in the EPRI [2026a] forecasts, equivalent to 9% to 16% of total US demand), it is likely that a significant amount of new generating capacity will need to be constructed despite any improvements in the utilization of the existing system.

Construction costs are also increasing. This means the scale of required capacity investments will make it hard—but not impossible—to design rate structures to maintain or lower electricity prices broadly. Retail rates for data centers in the future will depend, at least in part, on state utility tariffs and negotiations with data center operators (Birchard and Burnand 2026). Large load tariffs are being adopted in many areas that put data centers and other new large demand sources into separate utility tariffs. This rate flexibility allows utilities to better control costs and more accurately assign costs to the customers that are driving the need for capacity expansion without affecting other customer classes. This process is potentially facilitated by the fact that, unlike the distributed nature of electric vehicles—at least for personal light-duty use—data centers are expected to remain relatively concentrated (EPRI 2026a).

While data center impacts on retail rates may depend on future unknowns regarding different regions’ success in negotiating large load tariffs, it is possible at a wholesale level to estimate how increasing demand can raise generation costs from new investments and higher fuel consumption. Thus, this modeling analysis looks at how data centers can mitigate the impacts of their growth on wholesale generation costs within an environment of rising load growth and potentially higher natural gas prices.

The modeling includes assumptions about costs of improvements to transmission capacity as a part of any capacity additions. However, as these transmission and distribution cost estimates are several years old (EPA 2024a), they may not reflect current cost increases or supply shortages. Therefore, this report concentrates on average wholesale generation costs rather than retail rates or the mechanisms by which large load tariffs may be decided.

The questions of interest for this analysis are:

  • What can data centers do to alleviate their effects on overall generation costs?
  • Are the relative impacts of flexibility and other factors consistent across assumptions about future market conditions?
  • How might different natural gas prices or higher construction costs for gas turbines affect costs, and would they alter any potential benefits that can be achieved by designing flexibility mechanisms for data centers?

Highlights of the Analysis

There are ongoing uncertainties in: (1) data center forecasts, (2) electricity usage across different types of data centers, (3) the ability and willingness of data centers to alter the timing of their demands, (4) how many data centers will construct their own power generation over the next five to ten years, and (5) how utilities may structure large load tariffs. This modeling therefore covers scenario outcomes ranging from a future without any data center demands to a worst-case extreme in which all data center operations have completely inflexible hourly demand patterns and all their peak capacity needs have to be met by on-grid resources. Within these bounds, the modeling analysis is used to evaluate patterns that emerge in future generation costs and how they hold up across a range of sensitivity assumptions.

The main findings of the analysis include:

  • Bring your own power (BYOP), notwithstanding any potential benefits expected for speed of construction, can reduce average generation costs for the fraction of data center demand that remains on the grid—assuming that the supply curve for wholesale electricity is upward sloping (i.e., costs increase as production rises).
  • Increasing the off-grid BYOP share may shift on-grid generation away from natural gas because renewables are more cost effective than new gas units at lower levels of data center demand (this presumes off-grid generation is weighted toward natural gas for a variety of reasons).
  • Increasing levels of BYOP can lower generation costs by improving the utilization of existing capacity. However, this becomes more difficult as the absolute levels of data center demands rise in the future, which necessitates new capacity investments.
  • Flexibility in either peak demand hours of the year or across all hours of the year (or both) can reduce average generation costs by more than 50%.
  • Flexibility that reduces peak capacity needs (or reserve margin requirements) can lower wholesale costs even further.
  • If data centers are able to sell excess capacity to the grid (or, similarly, sell electricity during peak hours), wholesale costs can potentially decline for the grid as a whole, benefiting all customers, depending on the cost of the purchased capacity (electricity).
  • The same patterns of falling costs (compared to a worst-case inflexible scenario) hold across various levels of BYOP, flexibility assumptions, natural gas prices, and gas turbine costs.

Modeling

The analysis in this report is conducted using an updated version of the Dynamic Integrated Economy/Energy/Emissions Model (DIEM). The electricity model is a representation of US wholesale electricity markets and builds on past work performed with the DIEM model (see, for example, Ross et al. [2024] for an investigation of load growth, and Ross and Ewing [2026] for an evaluation of the impacts of data centers). The model represents intermediate- to long-run decisions by the markets regarding generation, transmission, capacity planning, and unit dispatch. To estimate impacts, it minimizes electricity generation costs while meeting electricity demand and policy goals.

Aside from updating the underlying forecasts and data on potential new units, revisions were made to the way in which load and its interaction with renewables availability are represented. In typical long-term capacity-planning models, load blocks (or demand blocks) are defined to segment the year—or particular seasons—into groups of hours with peak or high demand versus several groups with base levels of demand versus groups of hours with low demand. As noted by Blanford et al. (2018), this type of characterization works for systems with small quantities of intermittent renewables.

However, as non-dispatchable renewables play an ever-increasing role in the electricity system, this simplistic approach that emphasizes load to the exclusion of other considerations becomes less realistic. For example, while there can be hours and/or days in some regions where solar power reaches full efficiency at roughly the same time as the demand levels reach a peak (usually in the afternoons), on other days or in other regions this alignment of demand and solar potential may not occur in a one-to-one fashion. Wind generation is similarly variable, but is more likely to reach maximum effectiveness in the overnight hours when demand may be low.

To evaluate the potential long-run effects of data center flexibility, a model needs to represent not just hours of high demand but also the combination of high demand with low renewable generation. This allows it to fully estimate how total—and peaking—capacity in the system may change as data centers seek to avoid the highest cost hours. The techniques adopted in DIEM from EPRI’s US-REGEN model (2025b) and Blanford et al. (2018) first identify extreme hours across the country, characterized by high and low demand, high and low solar availability, high and low wind availability, and various combinations of these groups. The next step involves cluster analysis of the remaining hours during which conditions are not at the extremes, followed by weighting all selected representative hours to reflect the load curves, solar curves, and wind curves simultaneously while summing all hourly blocks to equal 8,760 hours in a year. Finally, the representative hourly blocks are assigned a chronology based on an expected value approach so that electricity storage and discharge across load blocks can be estimated (Merrick et al. 2024).

Forecast Assumptions

Scenario analyses begin by establishing a standard (or reference) forecast against which any changes in demands and system costs can be evaluated. In this case, the reference scenario is based on demand growth by sector from the Annual Energy Outlook 2026 (AEO 2026) (EIA 2026), excluding any demand from data centers. Although the AEO 2026 does include a data center category, its assumption of a gradual increase in demand does not match most recent forecasts. Thus, the model scenarios in this paper use the Medium forecast from EPRI (2026a), which implies that data center electricity demands will represent 13% of total demand by 2030 with growth slowing afterward, up from 4% to 5% of total demand today (Figure 1). The regional distribution of these demands is also taken from EPRI (2026a).

Figure 1. Electricity demand from data centers, TWh and percent of 2030 totals

A line chart shows projected electricity use in terawatt-hours (TWh) from 2025 to 2050 under five scenarios. The horizontal axis spans 2025–2050, and the vertical axis ranges from 0 to 1,400 TWh in 200-TWh increments. A vertical dashed line marks 2030.  Two black lines represent AEO scenarios. The solid black AEO Reference line rises from about 100 TWh in 2025 to approximately 450 TWh in 2050. The dashed black AEO High line increases from about 100 TWh to approximately 800 TWh, overtaking the reference line shortly after 2030.  Three red lines represent EPRI scenarios. The dotted red EPRI Low line rises from about 200 TWh in 2025 to roughly 500 TWh by 2045, then levels off. The solid red EPRI Medium line increases from about 250 TWh to 600 TWh in 2030, 800 TWh in 2035, and approximately 910 TWh in 2050. The dashed red EPRI High line rises most sharply, from about 250 TWh in 2025 to roughly 780 TWh in 2030 and about 1,300 TWh in 2050.  The legend appears to the right of the chart and identifies each line style and its stated 2030 percentage.

Sources: EIA (2026) and EPRI (2026a)

The AEO 2026 forecasts provide a range of potential natural gas prices (Figure 2). Unless these prices are particularly high, liquid natural gas exports are expected to double by 2050 in both the Reference case and the Low Gas Price case. This implies that—unlike what has been seen in recent events in global crude oil markets—global natural gas prices may not equilibrate.4

Figure 2. Natural gas price and turbine cost sensitivities, $ per MMBtu and $ per kW

A dual-axis line chart shows projected gas prices and power-generation capital costs from 2025 to 2050. The horizontal axis spans 2025, 2030, 2035, 2040, 2045, and 2050. The left vertical axis is labeled “per MMBtu" and ranges from 0 to 15; the right vertical axis is labeled “per kW” and ranges from 0 to 2,500.  Three dotted lines represent gas-price scenarios on the left axis: the black reference case starts near 4 per MMBtu, rises to about 5.4 around 2032, then gradually declines to about 4.6 by 2050; the blue high gas price case rises steadily from about 4.5 to nearly 14; and the orange low gas price case dips to about 3 around 20228, increases to roughly 4 by the early 2030s, and declines to just above 3 by 2050.  Four solid or dashed lines represent generation costs on the right axis. The black solid line, for combined-cycle generation under the reference case, decreases gradually from approximately 1,000 per kW to about 880 per kW. The black dashed high-cost combined-cycle line falls sharply from roughly 2,050 per kW to around 900 kW by 2040. The teal solid combustion turbine reference line declines from about 1,150 per kW to approximately 900 per kW. The teal dashed high-cost combustion turbine line drops from about 2,300 per kW to below 1,000 kW by 2040 and continues slightly downward. A legend appears to the right of the graph.

Sources: EIA (2026) and author calculations

The model’s standard assumptions about the capital costs of gas combined-cycle and combustion turbine units are taken from AEO’s Reference case as well. However, recent literature has suggested that currently capital costs for gas-generating units are routinely running at $2,000 per kW or more for delivery over the next five years (GridLab 2025). Potential implications of these types of costs are evaluated in the modeling by doubling capital costs from the AEO through 2030 and assuming a 50% increase is still present in 2035 before markets return to the original AEO cost forecasts by 2040.

Scenarios of Interest

Typically, most modeling begins by assuming that the pattern of sectoral electricity demand is inflexible throughout a year and follows historical precedent—this is the case in the Reference scenario and other scenarios without specified flexibility options. In the absence of published data on the hourly patterns of demand from data centers, load shapes—in the absence of flexibility—are taken from the National Laboratory of the Rockies’ Electrification Futures Study (EFS) (Mai et al. 2018).5 The analysis then extends these standard assumptions to look at several categories of demand flexibility across hours and peak demands, as outlined below:

  1. “Reference” scenario: A hypothetical future without any electricity demand from data centers. This scenario is established to represent one end of the potential range of future electricity costs, in the absence of any impacts from data centers. AEO estimates of data center electricity demands are subtracted from overall AEO Reference demand.
  2. BYOP scenarios: These “bring your own power” scenarios assume that specified shares of the total data center demands shown in the EPRI Medium forecast are provided by on-grid sources.
    1. “100% on Grid”: All data center demands are assumed to be supplied through the grid.
    2. “80% on Grid”: Four-fifths of demand are supplied through the grid and one-fifth of demand covered by other generating units is covered by BYOP.
    3. “50% on Grid”: Half of total data center demand is on the grid, and half is BYOP.
    4. “20% on Grid”: One-fifth of demand is supplied through the grid and four-fifths of demand is BYOP.
  3. Flexibility scenarios: These represent a range of flexibility options to evaluate how utilization of the system’s resources might be improved by adding data center demands when there is less stress on the grid, with concomitant impacts on generation costs.
    1. “Peak Demand Flexibility”: Looks at allowing data centers the temporal flexibility to avoid roughly the 100 highest demand hours of the year (if it is cost-effective for the grid to do so).
    2. “Flex 30% of Hours”: Allows data centers to flex up to 30% of total hours across the course of the year. This flexibility is an option—not a requirement—if economically advantageous, but the flexibility to fully avoid demands during peak hours is precluded in this scenario. EPRI (2026b) suggests that data centers, especially ones supporting AI workloads, are often expected to operate with relatively flat hourly profiles, and data in the EPRI (2026a) forecasts imply an overall utilization rate of around 70%. Hence, the 30% flexibility scenario.
    3. “Flex Peak and 30%”: Permits data centers both to avoid peak hours and also to flex up to 30% of total annual demand across hours of the year, if desired.
  4. Peak capacity: In addition to temporal demand flexibility, the peak capacity scenarios allow system planners to assume that all data center capacity does not need to be included in their peak reserve margins when evaluating how much generating capacity is needed for extreme events.
    1. “100% of Growth is Included in Peak Capacity”: Represents the worst-case scenario in which planners must assume that all data center capacity growth needs to be included in their reserve margin planning.
    2. “75% of Growth is Included in Peak Capacity”: Three quarters of total nominal data center capacity are covered by reserve margins. This is loosely based on the EPRI (2026a) forecasts that suggest average peak loads are around 75% of nominal capacity in 2030.
    3. “50% of Growth is Included in Peak Capacity”: Half of the capacity required to supply data centers is included in reserve margins.
    4. “25% of Growth is Included in Peak Capacity”: One quarter of capacity is included in reserve margins.
    5. “–25% of Growth is Included”: Assumes that data center operators are willing and able to provide spare capacity to the grid during times of peak stress, reducing the excess capacity that on-grid utilities need to build for themselves. The implications of this scenario are similar to what might be seen if data centers were selling excess electricity to the grid instead of capacity, so those types of scenarios are not included in this analysis.
  5. Sensitivities: Several sensitivity cases are run based on the data from Figure 2 to examine how changes in natural gas prices and unit construction costs may impact generation costs.
    1. “Low Gas Price”: Assumes that wholesale, or Henry Hub, natural gas prices remain around $3/MMBtu through 2050.
    2. “High Gas Price”: Assumes that wholesale gas prices increase roughly linearly from around $4/MMBtu in the near-term to $14/MMBtu by 2050.
    3. “High Gas Turbine Costs”: Assumes capital costs for gas combined-cycle and combustion turbine units are around $2,000 per kW over the next five to ten years, rather than $1,000 per kW, as a result of supply shortages (see Figure 2).

Model Results

As might be expected, growth in data center electricity demand will require substantial new generating capacity over the next decade and beyond (Figure 3). This additional generation—regardless of whether it occurs on grid or off grid—leads to emissions from the electricity sector that are around 20% higher, based on data center demands associated with EPRI’s Medium forecast through 2050.

Figure 3. US CO2 emissions forecasts from the electricity sector (without flexibility)

A line and marker chart shows historical and projected carbon emissions from 2005 to 2050. The vertical axis ranges from 0 to 2,500 MMTCO₂, and the horizontal axis shows years from 2005 to 2050. A thick black historical line begins near 2,400 MMTCO₂ in the late 2000s, fluctuates while generally declining, and ends near 1,500 MMTCO₂ around 2022. Five blue hollow circles labeled “Reference w/o Data Centers” appear from 2030 to 2050, declining from about 950 to 720 MMTCO₂. Five orange hollow triangles labeled “EPRI Medium Data Centers” appear at the same years, with values slightly higher than the blue circles, declining from about 1,100 to 860 MMTCO₂. Horizontal gridlines mark 500-MMTCO₂ intervals.

Sources: EPA (2024b) and DIEM model

Figure 4 looks at the sensitivity of wholesale generation costs to different sets of assumptions about future market conditions. The cost impacts of data center demands are shown as an index to facilitate comparison across scenarios, rather than presenting results in absolute dollar terms. How any absolute changes in generation costs are expressed in the market will largely depend on the structure of utility tariffs, which determine how costs from capacity-serving data centers are passed into broader retail rates. However, wholesale changes in system costs can be evaluated without attempting to guess how these dynamics will play out in the future. Using an index across sensitivity cases allows the findings to illustrate whether similar impacts may be seen across alternative future conditions.

Figure 4. Generation cost increases versus a reference without data centers (indices)

A grouped bar chart compares an “Index” for 2030 and 2035 under four scenario groups: Reference Assumptions, Low Gas Price, High Gas Price, and High Gas Turbine Costs. Each scenario contains four categories: 100%, 80%, 50%, and 20% on Grid. Blue bars represent 2030, and orange bars represent 2035. The vertical axis ranges from 0.0 to 1.0 in increments of 0.2.  In the Reference Assumptions group, values are approximately 1.00 for both years at 100% on Grid, 0.80 and 0.81 at 80%, 0.46 and 0.47 at 50%, and 0.18 for both years at 20%. Under Low Gas Price, values are approximately 1.00 for both years at 100%, 0.86 and 0.79 at 80%, 0.64 and 0.46 at 50%, and 0.23 and 0.22 at 20%. Under High Gas Price, values are approximately 1.00 for both years at 100%, 0.78 and 0.74 at 80%, 0.48 and 0.44 at 50%, and 0.18 and 0.11 at 20%. Under High Gas Turbine Costs, values are approximately 1.00 for both years at 100%, 0.74 and 0.71 at 80%, 0.38 and 0.34 at 50%, and 0.12 for both years at 20%.

Source: DIEM model
Note: Index value of 0.0 implies no cost increase compared to a reference without any data center demand

For each of the four groups of scenarios shown in Figure 4—which does not include any data center flexibility—the range of the cost index goes from zero (i.e., no impacts of data centers on wholesale generation costs because there are no data center demands) to one (a worst-case outcome in which all data center electricity is supplied through the grid and there is no hourly or peak data center flexibility).

As expected, reducing the share of data center demand that is on the grid reduces generation costs roughly in line with these demand reductions (note that costs of off-grid generation to supply the share of data centers not using grid electricity is not included in these indices). In some circumstances, the generation cost index declines by more than the hypothesized decline in data center demand, implying both that the model has an upward-sloping supply curve for electricity (i.e., marginal costs rise as more electricity is needed). For the Reference case assumptions and the alternative assumptions about gas generation, the cost indices tend to behave in similar ways, suggesting that the cost impacts of shifting data center demand off of the grid is likely to be similar in direction and magnitude across a range of future conditions.

Figure 5 looks at the increases in capacity that are associated with the range of on-grid shares shown in Figure 4 for the Reference assumptions. The findings on the left side of the figure suggest that if data center electricity demands of 600 TWh in 2030 (from Figure 1) are 100% supplied by on-grid capacity, the largest share of the generation will be supplied by new gas units, along with fewer coal plant retirements than would have occurred without the increase in overall electricity demand. Renewables and storage also see significant increases in the “100% on Grid” scenario. As the amount of data center electricity supplied by the grid declines, most types of new capacity decline as well.

Figure 5. Capacity increase in 2030 as percent of data center demands on the grid (GW and relative shares)

The image contains two side-by-side stacked bar charts comparing electricity-generation capacity at four levels of grid connection: 100%, 80%, 50%, and 20% on grid. The left chart shows capacity in gigawatts (GW), while the right chart shows the same categories as percentage capacity shares.  In the left chart, total capacity decreases from approximately 123 GW at 100% on grid to 92 GW at 80%, 55 GW at 50%, and 26 GW at 20%. Each bar is divided by technology. The largest portions at 100% and 80% on grid are NGCC, oil/gas steam, wind, and storage. At 50% and 20% on grid, the bars are smaller, with wind and storage remaining prominent. Coal, combustion turbines, and other technologies form smaller sections.  The right chart normalizes each bar to 100%. At 100% on grid, the capacity is distributed relatively evenly across the technologies. As the grid percentage decreases, coal makes up a larger share at 50% on grid, while wind becomes the largest segment. At 20% on grid, oil/gas steam and wind are among the largest portions, followed by hydro/other and storage. The bars use black, orange, gray patterned, white wavy, dark blue, yellow, teal, and burnt-orange sections, as identified in the legend between the charts.

Source: DIEM model
Note: The capacity “increases” shown for coal and oil/gas steam units are not actually new capacity. Rather, they represent a decline in steam-unit retirements compared to the reference scenario without electricity demands from data centers

However, as the relative capacity shares in the right side of the figure show, the capacity mix shifts toward new wind and away from gas and solar units at lower levels of on-grid data center demand. The implication is that the model’s data suggest that the lowest-cost option for small increases in generation is from onshore wind. As demand from on-grid data centers increases more, the model has to shift toward higher cost sources represented mainly by natural gas (and to a lesser extent, solar).6 The outcome shown is a function of the model’s upward sloping cost structure for different types of generation. However, its implications are similar to current conditions—where data center attempts to begin operations as quickly as possible lead them to pursue more expensive off-grid solutions, such as mobile gas turbines, rather than wait for potentially more cost-effective on-grid capacity to come online.

Figure 6 contrasts how wholesale generation costs vary across flexibility decisions, where all the sensitivities use an underlying assumption of 50% BYOP (i.e., 50% of data center demand from the EPRI Medium forecast, or around 400 TWh in 2035, is assumed to be provided by on-grid electricity). The starting point for these sensitivities is the no-flexibility index value of 1.0. This represents the most expensive possibility, where all 400 TWh are inflexible with respect to the pattern of hourly demands, regardless of cost. It also assumes the grid’s capacity reserves have to grow in 100% proportion to the total demand growth from data centers (this assumption holds for the first four columns of Figure 6).

Figure 6. Generation cost increases across hourly flexibility and peak capacity needs (indices for 2035 relative to 50% of data center demand on grid and no flexibility)

A vertical orange bar chart shows the 2035 “Index” for four flexibility scenarios across five levels of growth in peak capacity. The y-axis ranges from −0.20 to 1.00, with gridlines at 0.20 intervals. Within each group, the four bars represent “No Flexibility,” “Peak Demand Flex,” “Flex 30% of hours,” and “Flex Peak and 30%.”  For “100% of Growth is in Peak Capacity,” the bars are approximately 1.00, 0.68, 0.48, and 0.35. For “75% of Growth is in Peak Capacity,” they are approximately 0.70, 0.54, 0.33, and 0.31. For “50% of Growth is in Peak Capacity,” they are approximately 0.52, 0.49, 0.25, and 0.21. For “25% of Growth is in Peak Capacity,” they are approximately 0.36, 0.37, 0.14, and 0.12. For “-25% of Growth is in Peak Capacity,” they are approximately 0.07, 0.05, −0.10, and −0.08. The final two bars extend below zero. A legend centered beneath the chart identifies the orange bars as “2035.”

Source: DIEM model
Note: Index value of 0.0 implies no cost increase compared to a reference without any data center demand

Starting from this inflexible starting point scaled to a cost index of 1.0 (the farthest left column in the graph), allowing 100 hours of peak demands to flex into other hours of the year reduces the incremental generation costs associated with data center demands by 30% (i.e., the second column from the left-hand axis that is equal to 0.7). If 30% of all data center hours are flexible—while maintaining total demand levels—generation costs are reduced by 50% compared to the inflexible case. Combining both the peak hour flexibility with flexing 30% of annual demands lowers costs by two-thirds compared to the scenario without any flexibility options.

The subsequent four groups of options look at how lowering requirements for capacity reserves in the system can lower costs associated with data center growth. Assuming that only 75% of nominal data center capacity has to be factored into reserve margins reduces costs by around 30%, even without any hourly flexibility in demands (peak demands are still fully covered in this case by generation on the grid). Adding in various levels of hourly flexibility then reduces cost impacts from there. This pattern of cost declines holds true for the scenarios where either one half or one quarter of the data center capacities are factored into peak capacity needs.

The final set of four columns on the right-hand side of Figure 6 look at the implications of allowing, or encouraging, off-grid data centers to sell excess capacity to the grid in order for the on-grid system to meet peak reserve margins. Ignoring any costs associated with these capacity sales to the grid, the results suggest that it is possible for data centers to lead to lower (i.e., negative) costs for the grid than was the case when there was no demand from data centers. Similar negative costs from data centers would be feasible if data centers sold excess electricity to the grid, rather than capacity, but it would be harder to define a simple illustrative situation since both the quantity sold and the hours during which sales occurred would have to be defined.

In contrast to Figure 6 (which examines the range of hourly flexibility sensitivities for the 50% BYOP scenario), Figure 7 illustrates how costs may change depending on the assumption of how much of total data center demands are met through on-grid generation. In this case, the most expensive cost index represents the situation where all data center electricity is generated on the grid (100% BYOP), there is no flexibility in their hours, and peak capacity needs expand in proportion to data center demand growth. From that cost index of 1.0, the proportion of demand growth that is factored into peak capacity reserve margins is lowered to see how flexibility in both hours and capacity needs will lower costs as a function of the amount of off-grid generation by data centers. Broadly, the results suggest that it may be possible to avoid most generation cost increases from data centers through flexibility mechanisms, even if data centers are supplied by on-grid utility generation.

Figure 7. Generation cost increases across flexibility and reserve margin needs (indices for 2035 relative to 100% of data center demand on grid and no flexibility)

A vertical bar chart shows Index values for 2035 across four levels of grid availability: 100% on Grid, 80% on Grid, 50% on Grid, and 20% on Grid. Each group contains five categories: No Flexibility, Flex x Peak Demand and 30%, Flex & 50% in Peak Capacity, Flex & 25% in Peak Capacity, and Flex & -25% in Peak Capacity. The bars are dark orange, with horizontal gridlines from -0.20 to 1.00 in increments of 0.20.  For 100% on Grid, the values are approximately 1.00, 0.42, 0.22, 0.15, and 0.00, respectively. For 80% on Grid, they are approximately 0.80, 0.28, 0.15, 0.08, and -0.04. For 50% on Grid, they are approximately 0.47, 0.17, 0.10, 0.05, and -0.04. For 20% on Grid, they are approximately 0.18, 0.08, 0.04, 0.02, and -0.03. The highest value is 1.00 for “No Flexibility” at 100% on Grid; values generally decrease as grid availability and flexibility conditions change. A legend centered beneath the chart identifies the orange bars as “2035.”

Source: DIEM model 
Note: Index value of 0.0 implies no cost increase compared to a reference without any data center demand.

Finally, Figure 8 compares cost indices for several scenarios across assumptions about natural gas markets. The Reference sensitivities highlight several sets of assumptions that have been covered in the graphs above, while the Cheap/Expensive Gas and High Gas Turbine Cost sensitivities explore how well the conclusions about flexibility options and capacity sales may hold under different futures. The absolute cost of a cheap-gas future may not be the same as the cost of an expensive-gas future, but Figure 8 scales each scenario’s starting point to 1.0 so that the relative impacts of flexibility and capacity sales can be compared.

Figure 8. Generation cost increases across gas price and turbine cost sensitivities (indices relative to 100% of data center demand on grid and no flexibility by scenario)

A vertical bar chart shows the Index values for 2035 across four scenarios: Reference, Cheap Gas, Expensive Gas, and High Gas Turbine Cost. Each scenario contains five orange bars representing different grid and flexibility conditions. The y-axis ranges from −0.40 to 1.00.  For all four scenarios, “100% Grid, No Flex” reaches an index of 1.00. In the Reference scenario, the remaining values are approximately 0.47, 0.16, 0.09, and −0.04. In the Cheap Gas scenario, they are approximately 0.46, 0.05, −0.07, and −0.30. In the Expensive Gas scenario, they are approximately 0.44, 0.18, 0.08, and −0.04. In the High Gas Turbine Cost scenario, they are approximately 0.34, 0.13, 0.07, and −0.05. The bars are solid orange, with horizontal gridlines across the chart. A legend centered beneath the chart identifies the orange bars as “2035.”

Source: DIEM model 
Note: Index value of 0.0 implies no cost increase compared to a reference without any data center demand

Across both the Reference scenario and the gas-market sensitivities, similar patterns are seen, implying that data center flexibility remains a potentially valuable resource regardless of other market conditions. Sales of excess capacity by data centers to the grid can result in negative overall generation costs from data center demand growth. This is particularly evident in the scenario with cheap natural gas as the expanded range of new gas units built by data centers supplying their own electricity (50% Grid, All Flex, –25% Peak Cap) are potentially available to provide excess capacity to the grid during peak hours.

Limitations and Future Analysis

This analysis looked at impacts of data centers on generation costs across broad scenarios covering the potential benefits associated with demand flexibility in conjunction with future market conditions.

The counterfactual of zero flexibility used as a starting index when estimating cost impacts is not intended to suggest that this is a likely outcome, but merely to provide a consistent starting point when comparing alternative scenarios. Moving beyond these types of assumptions in the future will allow ample leeway to improve the representation and modeling of data center loads, including incorporating additional features such as the following:

  1. Specific impacts on retail prices. How changes in wholesale generation costs associated with data centers are translated into retail price impacts for other types of customers will depend on utility tariff structures. These tariffs are an area of ongoing interest and exploration as utilities decide how to cope with data center demand growth, the uncertainties involved, and retail consumer pushback against rate increases. Modeling can help illuminate the range of possible outcomes, but impacts are more uncertain than those associated with wholesale generation costs.
  2. Types of data centers and their hourly patterns. Disaggregating broad data center forecasts by type of data center and the associated hourly demands could provide additional clarity on potential options. As the EPRI DCFlex Initiative notes, hourly load shapes may change over time as new types of data center loads expand (EPRI 2025a). Hourly demand can also vary depending on factors related to the specific use cases and locations of the centers. For example, heating, ventilation, and air conditioning form a large share of data center electricity use and will vary by weather and location. Likewise, the workload of a data center can vary significantly during an AI model training phase versus its final application by end-users of the services.
  3. Data center flexibility. As suggested by the EPRI DCFlex Initiative, the ability of data centers to vary their demands in practice remains unclear, as does how flexibility may vary by type of data center (EPRI 2025a). If available, the modeling could easily incorporate these features into long-run analyses of likely implications for the electricity industry. Similarly, the modeling could also consider methods of encouraging flexibility. Such factors—both costs and incentives—could be internalized in the electricity sector capacity planning modeling.

References

Birchard, M., and N. Burnand. 2026. State Utility Tariffs: A Tool to Manage Large Load Growth. Georgetown Climate Center. https://www.georgetownclimate.org/files/article/GCC_Issue_Brief_State_Utility_Tariffs.pdf.

Blanford, G. J., J. H. Merrick, J. E. T. Bistline, and D. T. Young. 2018. “Simulating Annual Variation in Load, Wind, and Solar by Representative Hour Selection.” The Energy Journal 39 (3): 189–212. https://doi.org/10.5547/01956574.39.3.gbla.

Donohoo-Vallett, P., B. King, H. Kolus, and A. van Brummen. 2026. Caught in the Current: Historical and Prospective Drivers of Changes in US Electricity Prices. Rhodium Group. April 21, 2026. https://rhg.com/research/us-electricity-prices-drivers/.

E3. 2026. Understanding the Drivers of Rising Electricity Rates and the Role of Data Centers. Energy and Environmental Economics. https://www.ethree.com/wp-content/uploads/2026/05/Understanding-the-Drivers-of-Rising-Electricity-Rates-and-the-Role-of-Data-Centers_E3-2026.pdf.

EIA. 2025a. “Electric Power Annual.” Tables. US Energy Information Administration, October 16. https://www.eia.gov/electricity/annual/.

EIA. 2025b. “State Energy Data System (SEDS): 1960-2023.” US Energy Information Administration. https://www.eia.gov/state/seds/seds-data-complete.php#Consumption.

EIA. 2026. “Annual Energy Outlook 2026.” April 8. https://www.eia.gov/outlooks/aeo/.

EPA. 2024a. “Documentation for 2023 Reference Case.” US Environmental Protection Agency, April 25. https://www.epa.gov/power-sector-modeling/documentation-2023-reference-case.

EPA. 2024b. Inventory of U.S. Greenhouse Gas Emissions and Sinks: 1990-2022. EPA 430R-24004. US Environmental Protection Agency. https://www.epa.gov/ghgemissions/inventory-us-greenhouse-gas-emissions-and-sinks-1990-2022.

EPRI. 2025a. Grid Flexibility Needs and Data Center Characteristics. EPRI. https://www.epri.com/research/programs/063638/results/3002031504.

EPRI. 2025b. US-REGEN Documentation V2025. Version 2025. May. https://us-regen-docs.epri.com/v2025/.

EPRI. 2026a. Powering Intelligence 2026: Updated Scenarios of U.S. Data Center Electricity Use and Power Strategies. Electric Power Research Institute. https://powering-intelligence.epri.com/introduction.html.

EPRI. 2026b. Win-Win Watts: When Can Data Centers, Efficient Electrification, and New Loads Lower Electricity Prices? Electric Power Research Institute. https://winwin.epri.com.

GridLab. 2025. The New Reality of Power Generation. GridLab and Halcyon. https://gridlab.org/portfolio-item/gas-tubine-cost-report/.

Hledik, R., L. Lam, and K. Peters. 2025. The Untapped Grid: How Better Utilization of the Power System Can Improve Energy Affordability​. Brattle Group. https://www.brattle.com/the-untapped-grid/.

Howland, E. 2025. “Data Centers ‘Primary Reason’ for High PJM Capacity Prices: Market Monitor.” UtilityDive (Newton, MA), October 2. https://www.utilitydive.com/news/data-centers-pjm-capacity-auction-market-monitor/801780/.

Mai, T., P. Jadun, J. Logan, et al. 2018. Electrification Futures Study: Scenarios of Electric Technology Adoption and Power Consumption for the United States. NREL/TP-6A20-71500, 1459351. National Laboratory of the Rockies, Golden, CO. https://doi.org/10.2172/1459351.

Merrick, J. H., J. E. T. Bistline, and G. J. Blanford. 2024. “On Representation of Energy Storage in Electricity Planning Models.” Energy Economics 136 (August): 107675. https://doi.org/10.1016/j.eneco.2024.107675.

Mineo, L. 2026. “Why Are Communities Pushing Back against Data Centers?” The Harvard Gazette (Cambridge, MA), April 9. https://news.harvard.edu/gazette/story/2026/04/why-are-communities-pushing-back-against-data-centers/.

NLR. 2024. “2024 Electricity ATB Technologies and Data Overview.” https://atb.nrel.gov/electricity/2024/index.

NLR. 2026. “Regional Energy Deployment System.” National Laboratory of the Rockies, January 6. https://www.nrel.gov/analysis/reeds/.

Norris, T. H., T. Profeta, D. Patino-Echeverri, and A. Cowie-Haskell. 2025. Rethinking Load Growth: Assessing the Potential for Integration of Large Flexible Loads in US Power Systems. NI R 25-01. Nicholas Institute for Energy, Environment & Sustainability. https://nicholasinstitute.duke.edu/publications/rethinking-load-growth.

Rand, J., N. Manderlink, W. Gorman, et al. 2024. Queued Up: 2024 Edition—Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2023. Lawrence Berkeley National Laboratory. https://emp.lbl.gov/sites/default/files/2024-04/Queued%20Up%202024%20Edition_R2.pdf.

Ross, M. T., J. Ewing, B. Murray, T. Profeta, R. Stout, and M. Yoo. 2024. Planning for Growing Electricity Demand During an Era of Uncertain Renewables and Climate Policy. Report NI R 24-06. Nicholas Institute for Energy, Environment & Sustainability. https://nicholasinstitute.duke.edu/publications/planning-growing-electricity-demand-during-era-uncertain-renewables-and-climate-policy.

Ross, M. T., and J. Ewing. 2026. Data Centers and Generation Capacity over the Next Decade. NI 26-04. Nicholas Institute for Energy, Environment & Sustainability. https://nicholasinstitute.duke.edu/publications/data-centers-and-generation-capacity-over-next-decade.

Wiser, R., E. O’Shaughnessy, G. Barbose, P. Cappers, and W. Gorman. 2025. “Factors Influencing Recent Trends in Retail Electricity Prices in the United States.” The Electricity Journal 38 (4): 107516. https://doi.org/10.1016/j.tej.2025.107516.


You might also be interested in:


  1.   EPRI (2026a) forecasts that demand from electric vehicles could overtake data centers by the 2030s.↩︎
  2.   Similar conclusions regarding recent electricity price increases can be seen in the work by Wiser et al. (2025).↩︎
  3.   See the work by Howland (2025) for a discussion of how recent capacity cost increases have been driven by rapid growth in data centers.↩︎
  4.   The Low Price case is based on AEO’s High Oil and Gas Supply scenario with larger technology and productivity improvements, compared with a Low Oil and Gas Supply scenario giving the high prices.↩︎
  5.   This report uses the EFS Reference scenario for the commercial sector with moderate technology advancement and baseline flexibility.↩︎
  6.   Gas unit costs come from the AEO 2026 assumptions about turbine capital costs and fuel prices, while costs for renewables are based on the National Laboratory of the Rockies forecasts for renewable construction and grid connection costs (NLR 2024, 2026).↩︎