Cumberland Sandstone Glade Restoration at the William B. Bankhead National Forest

Sandstone glades of the Southern Cumberland Plateau are rare and unique plant communities exhibiting some of the richest endemic floras in the eastern United States. As a part of larger conservation initiative to rehabilitate and reconnect glade patches with the surrounding forest ecosystem, USFS at William B. Bankhead National Forest conduct a pilot project on a 3-acre glade.

Fort Sheridan

The Fort Sheridan Restoration Project restored 84 hectares of ravines, riparian woodlands, coastal bluff, beach, dunes, and lacustrine habitat along the coast of Lake Michigan. This project aimed to connect coastal habitats, restore native plant communities, and increase resilience along the coast. 

Clackamas River

The Clackamas River is a tributary to the Columbia River that has been degraded by beaver removal, logging, mining, overgrazing, and urban development. This disconnected the floodplain from its river and negatively impacted fish populations. This project restored habitat to help threatened and endangered salmonids. 

Howland Dam Fish Bypass

Dams in the Penobscot River have prevented fish passage from the Gulf of Maine for centuries. To restore connectivity, the Penobscot River Restoration Trust built the largest nature-based fish bypass channel in the United States. This project will help restore Atlantic Salmon populations, and the cultural heritage of the Penobscot Nation.  

Mill River Dam Removals

This project removed three aging dams and replaced a fourth on the Mill River in Taunton, Massachusetts to increase the area’s ecological and community resilience and reduce flooding. These efforts reconnected more than 48 kilometers of rivers and streams linked to Narragansett Bay. 

Boardman River Dam Removals

The U.S. Army Corps of Engineers (USACE)–Detroit District and several other partners used Great Lakes Restoration Initiative funding to reconnect 340 kilometers of the Boardman River to Grand Traverse Bay of Lake Michigan. This project involved three dam removals over six years, and improved riverine habitat for important species. 

Missouri River Levee Setbacks

After the 2011 Missouri river Flood event, the sponsors of Levee L-575 pursued the Nonstructural alternative (NSA) of a levee setback under the U.S. Army Corps of Engineers Disaster Operations Public Law 84-99 program. This setback relocated a segment of the levee from its current alignment to a location farther back from the banks.