Nicholas Institute for Environmental Policy Solutions
Nature-Based Solutions Case Study
Exploration Green
State/Territory:
Clear Lake City, TX has a history of intense flooding from hurricanes and other storm events. Exploration Green is a project to transform a former 200-acre golf course into a public park and flood-control area. The park will have 5 detention basins to store floodwater during storm events. The project has a 15-year timeline and is broken into 5 phases. The park will provide not only flood management but recreation and environmental education opportunities, as well as improve ecosystem health. The project will have a storage capacity of 500 million gallons and provide flood protection to over 30,000 residents.
Habitat Types
Click to search for case studies in similar habitats.
Strategies
Nature-based strategies examined in this case study.
Top Outcomes
Climate threat reduction, ecological benefits, or social & economic benefit goals obtained in this case. Click to search for case studies with similar outcomes.
Sourcing
Case study originally found at: https://erdc-library.erdc.dren.mil/jspui/bitstream/11681/45601/1/ERDC-TN EWN-22-7.pdf